Rio-Lick substation interconnection queue
2 active projects totaling 93.2 MW in the PJM queue.
2 PJM queue filings name Rio-Lick as the point of interconnection, all in Jackson County, OH.
Target commercial operation dates as filed run from Feb 2028 to Feb 2029 (2 filings). 2 active filings target a date after November 27, 2026.
2active projects
93.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-188 | Dixon Solar | 138 | 46.6 | Solar | Under Construction | Feb 2028 |
| AF2-048 | Dixon Solar | 138 | 46.6 | Solar | Under Construction | Feb 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-09 | AC1-188 | Status change | n/a | Engineering and Procurement → Under Construction |
| 2026-11-09 | AF2-048 | Status change | n/a | Engineering and Procurement → Under Construction |
Other PJM queue substations in Jackson County, OH
- Corwin - Elk: 2 active, 108 MW of 3 filed
- Lick: none active of 2 filed