Dixon Solar
PJM queue ID AC1-188
Dixon Solar (AC1-188) is listed in the PJM interconnection queue as a 46.6 MW solar project in Jackson County, OH. The filing names Rio-Lick as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of February 28, 2028.
| Queue ID | AC1-188 |
|---|---|
| Project name | Dixon Solar |
| Status (as published) | Under Construction |
| Substation | Rio-Lick |
| Point of interconnection | Rio-Lick 138kV |
| County | Jackson |
| State | OH |
| Voltage | 138 kV |
| Capacity | 46.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-02-28 |
| Source dataset | serial |
Same substation and county
Rio-Lick substation: 2 requests in the PJM queue, 2 active totaling 93.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-048 | Dixon Solar | 46.6 | Solar | Under Construction |
Jackson, OH: 10 requests in the PJM queue, 2 active totaling 93.2 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | Engineering and Procurement → Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 70 |
| MW capacity | 46.6 |
| MFO | 70 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.