Jackson, OH interconnection queue
5 active projects totalling 355.2 MW in the PJM queue, plus 7 with terminal status (shown greyed).
5active projects
355.2active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-055 | Kyger Creek - Don Marquis 345 kV | 345 | 154 | Solar | Active |
| AH1-554 | Lick 138 kV | 138 | 150 | Battery | Withdrawn |
| AI1-074 | Corwin - Elk 138 kV | 138 | 96 | Hybrid | Withdrawn |
| AG1-380 | Corwin-Elk 138 kV | 138 | 54 | Hybrid | Withdrawn |
| AG2-548 | Corwin - Elk 138 kV | 138 | 54 | Hybrid | Active |
| AG2-665 | Corwin - Elk 138 kV | 138 | 54 | Hybrid | Active |
| AC1-188 | Dixon Solar | 138 | 46.6 | Solar | Engineering and Procurement |
| AF2-048 | Dixon Solar | 138 | 46.6 | Solar | Engineering and Procurement |
| AC2-046 | EAst Beaver 138kV | 138 | 39.3 | Solar | Withdrawn |
| AE2-302 | East Beaver-Lick 138 kV | 138 | 29.9 | Solar | Withdrawn |
| AC2-035 | Lick-Firebrick 69kV | 69 | 29.4 | Solar | Withdrawn |
| AC2-037 | Lick 69kV | 69 | 12 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.