Substation Scout

Jackson, OH interconnection queue

2 active projects totalling 93.2 MW in the PJM queue, plus 8 with terminal status (shown greyed).

2active projects
93.2active MW
10total filed
Queue IDProjectkVMWResourceStatus
AH1-055 Kyger Creek - Don Marquis 345 kV 345 154 Solar Withdrawn
AH1-554 Lick 138 kV 138 150 Battery Withdrawn
AI1-074 Corwin - Elk 138 kV 138 96 Hybrid Withdrawn
AG1-380 Corwin-Elk 138 kV 138 54 Hybrid Withdrawn
AC1-188 Dixon Solar 138 46.6 Solar Engineering and Procurement
AF2-048 Dixon Solar 138 46.6 Solar Engineering and Procurement
AC2-046 EAst Beaver 138kV 138 39.3 Solar Withdrawn
AE2-302 East Beaver-Lick 138 kV 138 29.9 Solar Withdrawn
AC2-035 Lick-Firebrick 69kV 69 29.4 Solar Withdrawn
AC2-037 Lick 69kV 69 12 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.