Jackson, OH interconnection queue

5 active projects totalling 355.2 MW in the PJM queue, plus 7 with terminal status (shown greyed).

5active projects
355.2active MW
12total filed
Queue IDProjectkVMWResourceStatus
AH1-055 Kyger Creek - Don Marquis 345 kV 345 154 Solar Active
AH1-554 Lick 138 kV 138 150 Battery Withdrawn
AI1-074 Corwin - Elk 138 kV 138 96 Hybrid Withdrawn
AG1-380 Corwin-Elk 138 kV 138 54 Hybrid Withdrawn
AG2-548 Corwin - Elk 138 kV 138 54 Hybrid Active
AG2-665 Corwin - Elk 138 kV 138 54 Hybrid Active
AC1-188 Dixon Solar 138 46.6 Solar Engineering and Procurement
AF2-048 Dixon Solar 138 46.6 Solar Engineering and Procurement
AC2-046 EAst Beaver 138kV 138 39.3 Solar Withdrawn
AE2-302 East Beaver-Lick 138 kV 138 29.9 Solar Withdrawn
AC2-035 Lick-Firebrick 69kV 69 29.4 Solar Withdrawn
AC2-037 Lick 69kV 69 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.