Dixon Solar

PJM queue ID AF2-048

Dixon Solar (AF2-048) is listed in the PJM interconnection queue as a 46.6 MW solar project in Jackson County, OH. The filing names Rio-Lick as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of February 28, 2029.

Queue IDAF2-048
Project nameDixon Solar
Status (as published)Under Construction
SubstationRio-Lick
Point of interconnectionRio-Lick 138 kV
CountyJackson
StateOH
Voltage138 kV
Capacity46.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-02-28
Source datasetserial

Same substation and county

Rio-Lick substation: 2 requests in the PJM queue, 2 active totaling 93.2 MW.

Queue IDProjectMWResourceStatus
AC1-188Dixon Solar46.6SolarUnder Construction

Jackson, OH: 10 requests in the PJM queue, 2 active totaling 93.2 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Status change n/a Engineering and Procurement → Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy70
MW capacity46.6
MFO140

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.