Passyunk substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| D28 | Passyunk 230kV | 230 | 550 | Gas | Withdrawn |
| A27 | Passyunk 230 kV | 230 | 515 | Gas | Withdrawn |
| U2-029 | Passyunk | n/r | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.