Substation Scout

Potter-Harlan substation interconnection queue

2 active projects totalling 27.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
27.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-054 Green Meadows Solar 69 25.2 Solar Under Construction
AH2-108 Potter-Harlan 69 kV 69 21 Solar Withdrawn
AG2-236 Green Meadows Solar 69 2 Solar EP

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.