Shenango-Hoytdale substation interconnection queue
2 active projects totalling 1,000 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
1,000active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-044 | Hickory Run Energy Station | 345 | 870 | Gas | In Service |
| Y1-015 | Shenango-Hoytdale 345kV | 345 | 870 | Gas | Withdrawn |
| Y1-070 | Shenango-Hoytdale 345kV | 345 | 825 | Gas | Withdrawn |
| AD1-026 | Hickory Run Energy Station | 345 | 130 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.