Green Meadows Solar
PJM queue ID AG1-054
Green Meadows Solar (AG1-054) is listed in the PJM interconnection queue as a 25.2 MW solar project in Lawrence County, PA. The filing names Potter-Harlan as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of May 31, 2027.
| Queue ID | AG1-054 |
|---|---|
| Project name | Green Meadows Solar |
| Status (as published) | Under Construction |
| Substation | Potter-Harlan |
| Point of interconnection | Potter-Harlan 69 kV |
| County | Lawrence |
| State | PA |
| Voltage | 69 kV |
| Capacity | 25.2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-05-31 |
| Source dataset | serial |
Same substation and county
Potter-Harlan substation: 3 requests in the PJM queue, 2 active totaling 27.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG2-236 | Green Meadows Solar | 2 | Solar | EP |
| AH2-108 | Potter-Harlan 69 kV | 21 | Solar | Withdrawn |
Lawrence, PA: 24 requests in the PJM queue, 7 active totaling 2,521 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 40 |
| MW capacity | 25.2 |
| MFO | 40 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.