Lawrence, PA interconnection queue

7 active projects totalling 2,521 MW in the PJM queue, plus 17 with terminal status (shown greyed).

7active projects
2,521active MW
24total filed
Queue IDProjectkVMWResourceStatus
C01-1594 Shenango - McClelland 345 kV 345 1,488.8 Gas Active
AA1-044 Hickory Run Energy Station 345 870 Gas In Service
Y1-015 Shenango-Hoytdale 345kV 345 870 Gas Withdrawn
Y1-070 Shenango-Hoytdale 345kV 345 825 Gas Withdrawn
AG1-489 McClelland-Hoytdale 345 kV 345 145 Hybrid Withdrawn
AD1-026 Hickory Run Energy Station 345 130 Gas In Service
AF1-146 Firefly Solar 345 121.2 Solar Withdrawn
AF2-322 Firefly Solar 345 119.8 Solar Withdrawn
AF2-253 McClelland-Shenango 345 kV 345 42 Solar Withdrawn
AG1-054 Green Meadows Solar 69 25.2 Solar Under Construction
AH2-108 Potter-Harlan 69 kV 69 21 Solar Withdrawn
AA2-166 Shenango-Bedford 69kV 69 19.9 Gas Withdrawn
AH1-518 Pulaski Sub-New Wilmington 69kV 69 8 Solar Withdrawn
Y1-071 Kelly Generation Facility 25 6 Gas Withdrawn
AH2-391 Pomerico 69 kV 69 4.2 Solar Withdrawn
AF1-191 New Castle Generating Station 138 4 Gas In Service
AI1-200 Campbell 8.32 kV 32 4 Hybrid Withdrawn
AH2-394 Walters Karl 69 kV 69 3.8 Solar Withdrawn
AH2-389 Devlin 69 kV 69 3.6 Solar Withdrawn
AH2-392 Pomerico 69 kV II 69 2.8 Battery Withdrawn
AH2-390 Devlin Storage 69 kV 69 2.3 Battery Withdrawn
AH2-395 Walters Karl 69 kV II 69 2.3 Battery Withdrawn
AG2-236 Potter-Harlan 69 kV 69 2 Solar Active
AF1-190 New Castle Generating Station 69 1 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.