Green Meadows Solar
PJM queue ID AG2-236
Green Meadows Solar (AG2-236) is listed in the PJM interconnection queue as a 2 MW solar project in Lawrence County, PA. The filing names Potter-Harlan as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of January 2, 2027.
| Queue ID | AG2-236 |
|---|---|
| Project name | Green Meadows Solar |
| Status (as published) | EP |
| Substation | Potter-Harlan |
| Point of interconnection | Potter-Harlan 69 kV |
| County | Lawrence |
| State | PA |
| Voltage | 69 kV |
| Capacity | 2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-01-02 |
| Source dataset | cycle |
Same substation and county
Potter-Harlan substation: 3 requests in the PJM queue, 2 active totaling 27.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-054 | Green Meadows Solar | 25.2 | Solar | Under Construction |
| AH2-108 | Potter-Harlan 69 kV | 21 | Solar | Withdrawn |
Lawrence, PA: 24 requests in the PJM queue, 7 active totaling 2,521 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | Active → EP |
Additional filed fields
| Developer | Harlansburg PV I, LLC |
|---|---|
| Transmission owner | ATSI |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Final Agreement |
| MW energy | 20.0 |
| MW capacity | 2.0 |
| MFO | 60.0 |
| Submitted date | 3/15/2021 |
| Last updated | 7/21/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.