Green Meadows Solar
PJM queue ID AG2-236
| Queue ID | AG2-236 |
|---|---|
| Project name | Green Meadows Solar |
| Status (as published) | EP |
| Substation | Potter-Harlan |
| Point of interconnection | Potter-Harlan 69 kV |
| County | Lawrence |
| State | PA |
| Voltage | 69 kV |
| Capacity | 2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-01-02 |
| Source dataset | cycle |
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | Active → EP |
Additional filed fields
| Developer | Harlansburg PV I, LLC |
|---|---|
| Transmission Owner | ATSI |
| Project Type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Final Agreement |
| Mw Energy | 20.0 |
| Mw Capacity | 2.0 |
| Mfo | 60.0 |
| Submitted Date | 3/15/2021 |
| Last Updated | 7/21/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.