Ohio Central 345 kV
PJM queue ID C01-1886
Ohio Central 345 kV (C01-1886) is listed in the PJM interconnection queue as a 1,000 MW battery project in Muskingum County, OH. The filing names Ohio Central as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.
| Queue ID | C01-1886 |
|---|---|
| Project name | Ohio Central 345 kV |
| Status (as published) | Active |
| Substation | Ohio Central |
| Point of interconnection | Ohio Central 345 kV |
| County | Muskingum |
| State | OH |
| Voltage | 345 kV |
| Capacity | 1,000 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-10-31 |
| Source dataset | cycle |
Same substation and county
Ohio Central substation: 4 requests in the PJM queue, 3 active totaling 1,623.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| S101 | Dresden | 580 | Gas | In Service |
| AC1-100 | Dresden | 43.4 | Gas | In Service |
| P02 | Ohio Central 138kV | 550 | Gas | Withdrawn |
Muskingum, OH: 17 requests in the PJM queue, 6 active totaling 3,494.7 MW.
A substation with the same name is named in PJM transmission planning materials: Ohio Central (AEP, 5 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Cedar Holdco LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 1000.0 |
| MW capacity | 1000.0 |
| MFO | 1000.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/3/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.