Fairfax, VA interconnection queue
2 active projects totalling 20.9 MW in the PJM queue, plus 6 with terminal status (shown greyed).
2active projects
20.9active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X2-009 | Cedar Grove-Clifton 230kV | 230 | 206 | Not reported | Withdrawn |
| X2-055 | Cedar Grove-Clifton "B" 230kV | 230 | 206 | Not reported | Withdrawn |
| AG2-286 | Clifton 230 kV | 230 | 150 | Battery | Withdrawn |
| AG2-326 | Reston 230 kV | 230 | 100 | Battery | Withdrawn |
| S50 | Ogden Martin | 230 | 18 | Other | In Service |
| AH1-197 | Occoquan 230kV | 230 | 7.1 | Other | Withdrawn |
| W3-002 | I-95 Landfill Phase 2 | 34.5 | 2.9 | Gas | In Service |
| X3-055 | Occoquan 34.5kV | 34.5 | 0 | Other | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.