Substation Scout

Fairfax County, VA interconnection queue

1 active project totalling 68 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
68active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1113 Belvoir 230 kV 230 68 Battery Active
C01-1745 Occoquan 230 kV 230 8.1 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.