Cedar Grove-Clifton substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2012 to Mar 2015 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X2-009 | Cedar Grove-Clifton 230kV | 230 | 206 | Not reported | Withdrawn | Jun 2012 |
| Z2-055 | Cedar Grove-Clifton 230kV | 230 | 42 | Not reported | Withdrawn | Mar 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fairfax County, VA
- Occoquan: 2 active, 20.9 MW of 5 filed