Cedar Grove-Clifton substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
X2-009 Cedar Grove-Clifton 230kV 230 206 Not reported Withdrawn
Z2-055 Cedar Grove-Clifton 230kV 230 42 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.