Cedar Grove-Clifton substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X2-009 | Cedar Grove-Clifton 230kV | 230 | 206 | Not reported | Withdrawn |
| Z2-055 | Cedar Grove-Clifton 230kV | 230 | 42 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.