Madison, KY interconnection queue

2 active projects totalling 110.9 MW in the PJM queue, plus 7 with terminal status (shown greyed).

2active projects
110.9active MW
9total filed
Queue IDProjectkVMWResourceStatus
AF2-348 North Clark-Spurlock 345 kV 345 150 Solar Withdrawn
AF2-355 West Gerrard-J.K. Smith 345 kV 345 135 Solar Withdrawn
AI1-084 Fawkes - West Berea 138kV 138 90 Solar Withdrawn
AE2-308 Madison Solar 138 60 Solar EP
AG2-073 Crooksville 69 kV 69 50.9 Solar Active
AH1-410 Union City Tap – JK Smith 138 kV 138 40.8 Solar Withdrawn
AG1-306 Fawkes-Dale 138 kV 138 39 Solar Withdrawn
AF1-267 Union City Tap 138 kV 138 37 Solar Withdrawn
AE2-275 J.K. Smith-Fawkes 138 kV 138 7.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.