Marshall, IL interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-003 | Powerton-Mole Creek | n/r | 53.3 | Wind | Withdrawn |
| Y3-035 | Mole Creek 345kV | 345 | 12.7 | Wind | Withdrawn |
| Q85 | Minonk 34.5kV | 34.5 | 4 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.