Substation Scout

Clarke, VA interconnection queue

2 active projects totalling 28.8 MW in the PJM queue, plus 9 with terminal status (shown greyed).

2active projects
28.8active MW
11total filed
Queue IDProjectkVMWResourceStatus
C01-2202 Double Toll Gate - Old Chapel 138 kV 138 100 Battery Withdrawn
AG1-182 Soapstone Solar and BESS 138 65.2 Solar Withdrawn
AG2-510 Double Toll Gate 138 kV 138 60 Solar Withdrawn
AG2-511 Double Toll Gate - Millville 138 kV 138 60 Solar Withdrawn
AC2-081 Battle Town 115kV 115 38 Solar Withdrawn
AG1-186 Soapstone Solar and BESS 138 34.8 Battery Withdrawn
AG1-415 Beckett Solar 138 25 Solar Engineering and Procurement
AC2-135 Double Toll Gate 34.5kV 34.5 9.6 Solar Withdrawn
V4-053 Double Toll Gate 138kV 138 7.6 Solar Withdrawn
AC2-174 Double Tollgate Solar Project 34.5 3.8 Solar Withdrawn
Z2-030 Double Tollgate Solar Project 34.5 3.8 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.