Hope-Blevins Valley Tap substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-306 Flat Top Solar 69 26 Battery Withdrawn
AI2-374 Hope-Blevins Valley Tap 69 kV 69 20.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.