Bath, KY interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-307 | Flat Top Solar | 69 | 39.6 | Solar | Withdrawn |
| AH1-463 | Owingsville - Preston 69 kV | 69 | 39 | Solar | Withdrawn |
| AI2-374 | Hope-Blevins Valley Tap 69 kV | 69 | 20.6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.