Bon Ayr substation interconnection queue

1 active project totalling 15 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
15active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-071 Wood Duck 100 MW 69 37.5 Solar Withdrawn
AG1-070 Wood Duck 100 MW 69 32.7 Solar Withdrawn
C01-1794 Bon Ayr 69 kV 69 15 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.