Bon Ayr substation interconnection queue
1 active project totaling 15 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Bon Ayr as the point of interconnection, all in Barren County, KY.
Target commercial operation dates as filed run from Jun 2024 to Dec 2028 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: EKPC (3 filings).
1active projects
15active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-071 | Wood Duck 100 MW | 69 | 37.5 | Solar | Withdrawn | Jun 2024 |
| AG1-070 | Wood Duck 100 MW | 69 | 32.7 | Solar | Withdrawn | Jun 2024 |
| C01-1794 | Bon Ayr 69 kV | 69 | 15 | Solar | Active | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Barren County, KY
- Temple Hill - Roseville: 1 active, 50 MW of 2 filed
- Barren County-Summer Shade: none active of 2 filed
- Hope-Blevins Valley Tap: none active of 2 filed