Barren, KY interconnection queue

6 active projects totalling 173 MW in the PJM queue, plus 11 with terminal status (shown greyed).

6active projects
173active MW
17total filed
Queue IDProjectkVMWResourceStatus
AE1-247 Barren County-Summer Shade 161 kV 161 137.1 Hybrid Withdrawn
AH2-021 Summer Shade - Barren County 161 kV 161 105 Hybrid Withdrawn
AF1-163 Barren-Summer Shade 161 kV 161 80.8 Solar Withdrawn
C01-2170 Patton Road - Summer Shade 69 kV 69 75 Hybrid Active
AH1-034 Scotland Solar 69 70 Solar Withdrawn
AE1-246 Barren County-Summer Shade 161 kV 161 57.2 Solar Withdrawn
C01-1665 Temple Hill - Roseville 69 kV 69 50 Battery Active
AH2-002 Temple Hill - Roseville 69 kV 69 48 Solar Withdrawn
AG1-071 Wood Duck 100 MW 69 37.5 Solar Withdrawn
AF1-083 Flat Run Solar 161 33 Solar Engineering and Procurement
AG1-070 Wood Duck 100 MW 69 32.7 Solar Withdrawn
AF2-306 Flat Top Solar 69 26 Battery Withdrawn
AG1-067 Temple Hill 69 kV 69 24.8 Solar Withdrawn
AG2-317 Barren - Summer Shade 161 kV 161 23.3 Hybrid Withdrawn
C01-1794 Bon Ayr 69 kV 69 15 Solar Active
C01-1043 West Glasgow 25 kV 25 0 Solar Active
C01-1062 Beckton 25 kV 25 0 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.