Substation Scout

Barren County-Summer Shade substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-247 Barren County-Summer Shade 161 kV 161 137.1 Hybrid Withdrawn
AE1-246 Barren County-Summer Shade 161 kV 161 57.2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.