Heartsease DP - Mayo Dunbar substation interconnection queue
2 active projects totalling 45.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
45.1active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC1-034 | Edgecome Solar Energy Center | 115 | 42.8 | Solar | Engineering and Procurement |
| AI2-141 | Heartsease DP - Mayo Dunbar 115kV | 115 | 18.8 | Solar | Withdrawn |
| AH1-311 | Heartsease DP - Mayo Dunbar 115kV | 115 | 2.3 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.