2 active projects totaling 45.1 MW in the PJM queue, plus 1 with terminal status (shown grayed).

3 PJM queue filings name Heartsease DP - Mayo Dunbar as the point of interconnection, all in Edgecombe County, NC.

Target commercial operation dates as filed run from May 2023 to Dec 2027 (3 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: Dominion (1 filing).

2active projects
45.1active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-034 Edgecome Solar Energy Center 115 42.8 Solar Engineering and Procurement Dec 2027
AI2-141 Heartsease DP - Mayo Dunbar 115kV 115 18.8 Solar Withdrawn May 2023
AH1-311 Heartsease DP - Mayo Dunbar 115kV 115 2.3 Solar Active Dec 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Edgecombe County, NC

All 23 PJM queue filings in Edgecombe County, NC.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first