Heartsease DP - Mayo Dunbar substation interconnection queue
2 active projects totaling 45.1 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Heartsease DP - Mayo Dunbar as the point of interconnection, all in Edgecombe County, NC.
Target commercial operation dates as filed run from May 2023 to Dec 2027 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
2active projects
45.1active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-034 | Edgecome Solar Energy Center | 115 | 42.8 | Solar | Engineering and Procurement | Dec 2027 |
| AI2-141 | Heartsease DP - Mayo Dunbar 115kV | 115 | 18.8 | Solar | Withdrawn | May 2023 |
| AH1-311 | Heartsease DP - Mayo Dunbar 115kV | 115 | 2.3 | Solar | Active | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Edgecombe County, NC
- Edgecombe: 1 active, 100 MW of 2 filed
- Benson-Dunbar: 1 active, 66 MW of 2 filed
- Tarboro-Everetts: 2 active, 56 MW of 2 filed
- Chinquapin: none active of 2 filed