Substation Scout

Edgecombe substation interconnection queue

1 active project totalling 100 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-303 Swift Creek Solar 230 100 Hybrid Engineering and Procurement
AF2-324 Edgecombe 230 kV 230 45 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.