Benson-Dunbar substation interconnection queue
1 active project totalling 66 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
66active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-059 | Moccasin Creek Solar | 115 | 66 | Solar | In Service |
| AI2-299 | Benson-Dunbar 115 kV | 115 | 30.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.