Benson-Dunbar substation interconnection queue
1 active project totaling 66 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Benson-Dunbar as the point of interconnection, all in Edgecombe County, NC.
Target commercial operation dates as filed run from Jun 2020 to Dec 2020 (2 filings).
1active projects
66active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-059 | Moccasin Creek Solar | 115 | 66 | Solar | In Service | Jun 2020 |
| AI2-299 | Benson-Dunbar 115 kV | 115 | 30.8 | Solar | Withdrawn | Dec 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Edgecombe County, NC
- Edgecombe: 1 active, 100 MW of 2 filed
- Tarboro-Everetts: 2 active, 56 MW of 2 filed
- Heartsease DP - Mayo Dunbar: 2 active, 45.1 MW of 3 filed
- Chinquapin: none active of 2 filed
Site Scanner