Gary 25 kV
PJM queue ID C01-1889
Gary 25 kV (C01-1889) is listed in the PJM interconnection queue as a 10.5 MW solar project in Lunenburg County, VA. The filing names Gary as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.
| Queue ID | C01-1889 |
|---|---|
| Project name | Gary 25 kV |
| Status (as published) | Active |
| Substation | Gary |
| Point of interconnection | Gary 25 kV |
| County | Lunenburg |
| State | VA |
| Voltage | 25 kV |
| Capacity | 10.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-10-31 |
| Source dataset | cycle |
Same substation and county
Gary substation: 4 requests in the PJM queue, 2 active totaling 12.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-396 | Gary 24.94 kV | 1.8 | Solar | Active |
| AH1-656 | Gary 115kV | 48 | Solar | Withdrawn |
| AI2-256 | Gary 115kV | 20 | Solar | Withdrawn |
Lunenburg, VA: 21 requests in the PJM queue, 7 active totaling 291.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Oriden LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 42.0 |
| MW capacity | 10.5 |
| MFO | 42.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/17/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.