Hancock, OH interconnection queue

3 active projects totalling 159.6 MW in the PJM queue, plus 16 with terminal status (shown greyed).

3active projects
159.6active MW
19total filed
Queue IDProjectkVMWResourceStatus
C01-1901 Fostoria - S Berwick 345 kV 345 1,200 Gas Withdrawn
AG2-375 Fostoria Central 345 kV 345 500 Battery Withdrawn
AE1-146 Border Basin 138 81.8 Solar Partially in Service - Under Construction
AF2-375 South Branch Solar 138 77.8 Solar Engineering and Procurement
AG2-547 New Liberty - Boutwell 138 kV 138 50 Hybrid Withdrawn
AG1-076 South Branch Solar 138 46 Solar Pending Termination
AG2-579 Fostoria 138 kV 138 41 Solar Withdrawn
W3-011 East Lima-Fostoria Central 345kV 345 39 Wind Withdrawn
W3-012 East Lima-Fostoria Central 345kV 345 39 Wind Withdrawn
AD1-070 South Branch Solar 138 36 Solar Pending Termination
AI2-305 Ebersole #2-Fostoria Central 138 kV 138 33.6 Solar Withdrawn
AH2-346 East Arlington 69 kV 69 31.9 Hybrid Withdrawn
AI2-407 Fostoria Central 138 kV 138 31.2 Solar Withdrawn
X2-058 Buckley Road 138kV 138 19.4 Wind Withdrawn
V4-015 Fostoria Central 138kV 138 8.6 Wind Withdrawn
W2-001 Fostoria Central 138/kV n/r 8.6 Wind Withdrawn
V1-015 New Liberty 138kV 138 4.8 Gas Withdrawn
X3-001 Edgewood 34.5 0.7 Solar Withdrawn
V4-011 Granger Electric of Hancock County n/r 0 Gas In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.