Hancock, OH interconnection queue
3 active projects totalling 159.6 MW in the PJM queue, plus 16 with terminal status (shown greyed).
3active projects
159.6active MW
19total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1901 | Fostoria - S Berwick 345 kV | 345 | 1,200 | Gas | Withdrawn |
| AG2-375 | Fostoria Central 345 kV | 345 | 500 | Battery | Withdrawn |
| AE1-146 | Border Basin | 138 | 81.8 | Solar | Partially in Service - Under Construction |
| AF2-375 | South Branch Solar | 138 | 77.8 | Solar | Engineering and Procurement |
| AG2-547 | New Liberty - Boutwell 138 kV | 138 | 50 | Hybrid | Withdrawn |
| AG1-076 | South Branch Solar | 138 | 46 | Solar | Pending Termination |
| AG2-579 | Fostoria 138 kV | 138 | 41 | Solar | Withdrawn |
| W3-011 | East Lima-Fostoria Central 345kV | 345 | 39 | Wind | Withdrawn |
| W3-012 | East Lima-Fostoria Central 345kV | 345 | 39 | Wind | Withdrawn |
| AD1-070 | South Branch Solar | 138 | 36 | Solar | Pending Termination |
| AI2-305 | Ebersole #2-Fostoria Central 138 kV | 138 | 33.6 | Solar | Withdrawn |
| AH2-346 | East Arlington 69 kV | 69 | 31.9 | Hybrid | Withdrawn |
| AI2-407 | Fostoria Central 138 kV | 138 | 31.2 | Solar | Withdrawn |
| X2-058 | Buckley Road 138kV | 138 | 19.4 | Wind | Withdrawn |
| V4-015 | Fostoria Central 138kV | 138 | 8.6 | Wind | Withdrawn |
| W2-001 | Fostoria Central 138/kV | n/r | 8.6 | Wind | Withdrawn |
| V1-015 | New Liberty 138kV | 138 | 4.8 | Gas | Withdrawn |
| X3-001 | Edgewood | 34.5 | 0.7 | Solar | Withdrawn |
| V4-011 | Granger Electric of Hancock County | n/r | 0 | Gas | In Service |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.