Substation Scout

East Lima-Fostoria Central substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W3-011 East Lima-Fostoria Central 345kV 345 39 Wind Withdrawn
W3-012 East Lima-Fostoria Central 345kV 345 39 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.