Ebersole #2-Fostoria Central substation interconnection queue

1 active project totaling 81.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Ebersole #2-Fostoria Central as the point of interconnection, all in Hancock County, OH.

Target commercial operation dates as filed run from Dec 2025 to Dec 2026 (2 filings). 1 active filing targets a date after November 27, 2026.

1active projects
81.8active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-146 Border Basin 138 81.8 Solar Partially in Service - Under Construction Dec 2026
AI2-305 Ebersole #2-Fostoria Central 138 kV 138 33.6 Solar Withdrawn Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-28AE1-146Status changen/a Under Construction → Partially in Service - Under Construction

Other PJM queue substations in Hancock County, OH

All 19 PJM queue filings in Hancock County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first