Substation Scout

Ebersole #2-Fostoria Central substation interconnection queue

1 active project totalling 81.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
81.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-146 Border Basin 138 81.8 Solar Under Construction
AI2-305 Ebersole #2-Fostoria Central 138 kV 138 33.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.