Ebersole #2-Fostoria Central substation interconnection queue
1 active project totalling 81.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
81.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-146 | Border Basin | 138 | 81.8 | Solar | Under Construction |
| AI2-305 | Ebersole #2-Fostoria Central 138 kV | 138 | 33.6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.