Fall Creek 345 kV
PJM queue ID C01-1356
Fall Creek 345 kV (C01-1356) is listed in the PJM interconnection queue as a 300 MW battery project in Madison County, IN. The filing names Fall Creek as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | C01-1356 |
|---|---|
| Project name | Fall Creek 345 kV |
| Status (as published) | Active |
| Substation | Fall Creek |
| Point of interconnection | Fall Creek 345 kV |
| County | Madison |
| State | IN |
| Voltage | 345 kV |
| Capacity | 300 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Fall Creek substation: 4 requests in the PJM queue, 2 active totaling 380 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-408 | Fall Creek Energy Storage | 80 | Battery | Engineering and Procurement |
| AF2-407 | Liberty II Storage | 300 | Battery | Withdrawn |
| AH2-352 | Fall Creek 345 kV | 240 | Solar | Withdrawn |
Madison, IN: 17 requests in the PJM queue, 3 active totaling 406 MW.
A substation with the same name is named in PJM transmission planning materials: Fall Creek (AEP, 5 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Liberty Madison Storage II LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 300.0 |
| MW capacity | 300.0 |
| MFO | 300.0 |
| Submitted date | 4/27/2026 |
| Last updated | 7/9/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.