Arche Energy Project
PJM queue ID AE2-282
Arche Energy Project (AE2-282) is listed in the PJM interconnection queue as a 43.9 MW solar project in Fulton County, OH. The filing names East Fayette as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.
| Queue ID | AE2-282 |
|---|---|
| Project name | Arche Energy Project |
| Status (as published) | In Service |
| Substation | East Fayette |
| Point of interconnection | East Fayette 138 kV |
| County | Fulton |
| State | OH |
| Voltage | 138 kV |
| Capacity | 43.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-12-31 |
| Source dataset | serial |
Same substation and county
East Fayette substation: 2 requests in the PJM queue, 2 active totaling 163.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-206 | CG Fulton County | 119.4 | Solar | Engineering and Procurement |
Fulton, OH: 13 requests in the PJM queue, 3 active totaling 189.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 67 |
| MW capacity | 43.9 |
| MFO | 67 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.