Double Tollgate Solar Project

PJM queue ID Z2-030

Double Tollgate Solar Project (Z2-030) is listed in the PJM interconnection queue as a 3.8 MW solar project in Clarke County, VA. The filing names Double Toll Gate as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2016.

Queue IDZ2-030
Project nameDouble Tollgate Solar Project
Status (as published)In Service
SubstationDouble Toll Gate
Point of interconnectionDouble Toll Gate 34.5kV
CountyClarke
StateVA
Voltage34.5 kV
Capacity3.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2016-12-31
Source datasetserial

Same substation and county

Double Toll Gate substation: 4 requests in the PJM queue, 1 active totaling 3.8 MW.

Queue IDProjectMWResourceStatus
AG2-510Double Toll Gate 138 kV60SolarWithdrawn
AC2-135Double Toll Gate 34.5kV9.6SolarWithdrawn
V4-053Double Toll Gate 138kV7.6SolarWithdrawn

Clarke, VA: 11 requests in the PJM queue, 2 active totaling 28.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy10
MW capacity3.8
MFO10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.