Disputanta-Poe substation interconnection queue

1 active project totalling 60 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
60active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-149 Bakers Pond Solar 115 60 Solar Suspended
AI2-449 Disputanta-Poe 115 kV 115 36.8 Solar Withdrawn
AE2-052 Disputanta-Poe 115 kV 115 20 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.