Disputanta-Poe substation interconnection queue
1 active project totaling 60 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Disputanta-Poe as the point of interconnection, all in Prince George County, VA.
Target commercial operation dates as filed run from Sep 2021 to Jul 2026 (3 filings).
1active projects
60active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-149 | Bakers Pond Solar | 115 | 60 | Solar | Suspended | Jul 2026 |
| AI2-449 | Disputanta-Poe 115 kV | 115 | 36.8 | Solar | Withdrawn | Dec 2025 |
| AE2-052 | Disputanta-Poe 115 kV | 115 | 20 | Battery | Withdrawn | Sep 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Prince George County, VA
- Hopewell-Surry: 4 active, 325.8 MW of 15 filed
- Poe-Suffolk: none active of 2 filed