Disputanta-Poe substation interconnection queue

1 active project totaling 60 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Disputanta-Poe as the point of interconnection, all in Prince George County, VA.

Target commercial operation dates as filed run from Sep 2021 to Jul 2026 (3 filings).

1active projects
60active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-149 Bakers Pond Solar 115 60 Solar Suspended Jul 2026
AI2-449 Disputanta-Poe 115 kV 115 36.8 Solar Withdrawn Dec 2025
AE2-052 Disputanta-Poe 115 kV 115 20 Battery Withdrawn Sep 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Prince George County, VA

All 23 PJM queue filings in Prince George County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first