Substation Scout

Poe-Suffolk substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
X1-080 Poe-Suffolk 115kV 115 135 Gas Withdrawn
X3-032 Poe-Suffolk 115kV 115 20 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.