Prince George, VA interconnection queue

5 active projects totalling 400.8 MW in the PJM queue, plus 18 with terminal status (shown greyed).

5active projects
400.8active MW
23total filed
Queue IDProjectkVMWResourceStatus
C01-1076 Temple 115 kV 115 200 Battery Active
X1-080 Poe-Suffolk 115kV 115 135 Gas Withdrawn
AB2-190 Fort Powhatan Solar 230 105 Solar In Service
AG2-093 Spruance Genco, LLC n/r 100 Hybrid Withdrawn
AG2-523 Bakers Pond 115 kV 115 100 Hybrid Withdrawn
AH2-246 Polyester S/S 230kV 230 100 Battery Withdrawn
AH2-378 Appomattox ESC n/r 100 Battery Withdrawn
AE1-149 Bakers Pond Solar 115 60 Solar Suspended
AA2-177 Fort Powhatan Solar 230 56 Solar Withdrawn
AH1-732 Not reported n/r 50 Battery Withdrawn
AH2-139 Not reported n/r 50 Battery Withdrawn
AH2-141 Not reported n/r 50 Battery Withdrawn
AI1-087 Disputanta - Bakers Pond 115 kV 115 50 Battery Withdrawn
AI1-088 Poe- New Bohemia 115kV 115 50 Battery Withdrawn
AG1-544 Bakers Pond DP 115 kV 115 39 Hybrid Withdrawn
AI2-449 Disputanta-Poe 115 kV 115 36.8 Solar Withdrawn
C01-1107 Sisisky 115 kV 115 25 Battery Active
AC2-078 Warwick PVI 115 22.8 Solar Withdrawn
AE2-052 Disputanta-Poe 115 kV 115 20 Battery Withdrawn
X3-032 Poe-Suffolk 115kV 115 20 Gas Withdrawn
AG1-545 W. Quaker Rd-Disputanta 34.5 kV 34.5 14 Hybrid Withdrawn
AD1-156 Rives Road Solar 34.5 11.8 Solar Withdrawn
AG2-095 Hopewell 34.5 kV (Circuit 313) 34.5 10.8 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.