Bakers Pond Solar
PJM queue ID AE1-149
Bakers Pond Solar (AE1-149) is listed in the PJM interconnection queue as a 60 MW solar project in Prince George County, VA. The filing names Disputanta-Poe as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of July 1, 2026.
| Queue ID | AE1-149 |
|---|---|
| Project name | Bakers Pond Solar |
| Status (as published) | Suspended |
| Substation | Disputanta-Poe |
| Point of interconnection | Disputanta-Poe 115 kV |
| County | Prince George |
| State | VA |
| Voltage | 115 kV |
| Capacity | 60 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-07-01 |
| Source dataset | serial |
Same substation and county
Disputanta-Poe substation: 3 requests in the PJM queue, 1 active totaling 60 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-449 | Disputanta-Poe 115 kV | 36.8 | Solar | Withdrawn |
| AE2-052 | Disputanta-Poe 115 kV | 20 | Battery | Withdrawn |
Prince George, VA: 23 requests in the PJM queue, 5 active totaling 400.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 60 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.