Substation Scout

Bakers Pond Solar

PJM queue ID AE1-149

Bakers Pond Solar (AE1-149) is listed in the PJM interconnection queue as a 60 MW solar project in Prince George County, VA. The filing names Disputanta-Poe as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of July 1, 2026.

Queue IDAE1-149
Project nameBakers Pond Solar
Status (as published)Suspended
SubstationDisputanta-Poe
Point of interconnectionDisputanta-Poe 115 kV
CountyPrince George
StateVA
Voltage115 kV
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-07-01
Source datasetserial

Same substation and county

Disputanta-Poe substation: 3 requests in the PJM queue, 1 active totaling 60 MW.

Queue IDProjectMWResourceStatus
AI2-449Disputanta-Poe 115 kV36.8SolarWithdrawn
AE2-052Disputanta-Poe 115 kV20BatteryWithdrawn

Prince George, VA: 23 requests in the PJM queue, 5 active totaling 400.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity60
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first