Delano substation interconnection queue
1 active project totaling 33.9 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Delano as the point of interconnection, all in Ross County, OH.
Target commercial operation dates as filed run from Oct 2017 to May 2024 (3 filings).
1active projects
33.9active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-001 | Salt City Solar | 138 | 33.9 | Solar | In Service | Aug 2023 |
| AB2-083 | Delano 138kV | 138 | 27.2 | Solar | Withdrawn | Oct 2017 |
| AG2-504 | Delano 138 kV | 138 | 5 | Battery | Withdrawn | May 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Ross County, OH
- Biers Run-Circleville: 3 active, 138.7 MW of 6 filed
- Buckskin: 2 active, 77.2 MW of 10 filed
- Hillsboro-Clinton: 1 active, 58.1 MW of 2 filed