Salt City Solar
PJM queue ID AC1-001
Salt City Solar (AC1-001) is listed in the PJM interconnection queue as a 33.9 MW solar project in Ross County, OH. The filing names Delano as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 31, 2023.
| Queue ID | AC1-001 |
|---|---|
| Project name | Salt City Solar |
| Status (as published) | In Service |
| Substation | Delano |
| Point of interconnection | Delano 138kV |
| County | Ross |
| State | OH |
| Voltage | 138 kV |
| Capacity | 33.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-08-31 |
| Source dataset | serial |
Same substation and county
Delano substation: 3 requests in the PJM queue, 1 active totaling 33.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-083 | Delano 138kV | 27.2 | Solar | Withdrawn |
| AG2-504 | Delano 138 kV | 5 | Battery | Withdrawn |
Ross, OH: 24 requests in the PJM queue, 8 active totaling 457.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 49.9 |
| MW capacity | 33.93 |
| MFO | 49.9 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.