Providence Forge-Turner substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Providence Forge-Turner as the point of interconnection, all in Charles City, VA.

Target commercial operation dates as filed run from Sep 2024 to Sep 2029 (2 filings).

Transmission owner as filed: Dominion (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-042 Stony Run Solar Project, LLC 115 99.9 Solar Withdrawn Sep 2029
AI2-338 Providence Forge-Turner 115kV 115 29.2 Solar Withdrawn Sep 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Charles City, VA

All 16 PJM queue filings in Charles City, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first