Chickahominy Solar 1 and 2
PJM queue ID AC1-164
Chickahominy Solar 1 and 2 (AC1-164) is listed in the PJM interconnection queue as a 220.8 MW solar project in Charles City, VA. The filing names Chickahominy as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of March 31, 2026.
| Queue ID | AC1-164 |
|---|---|
| Project name | Chickahominy Solar 1 and 2 |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Chickahominy |
| Point of interconnection | Chickahominy 230kV |
| County | Charles City |
| State | VA |
| Voltage | 230 kV |
| Capacity | 220.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-03-31 |
| Source dataset | serial |
Same substation and county
Chickahominy substation: 11 requests in the PJM queue, 1 active totaling 220.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC1-107 | Chickahominy Power | 1,600 | Gas | Withdrawn |
| AB2-068 | C4GT | 1,060 | Gas | Withdrawn |
| AF2-053 | Chickahominy 500kV | 200 | Gas | Withdrawn |
| AI1-013 | Chickahominy 230 kV | 200 | Battery | Withdrawn |
| C01-1373 | Chickahominy 230 kV | 200 | Battery | Withdrawn |
| AF1-329 | Chickahominy 230 kV | 172.5 | Solar | Withdrawn |
| AI2-296 | Chickahominy 230kV | 83.2 | Solar | Withdrawn |
| AH1-288 | Chickahominy 230kV | 43.2 | Battery | Withdrawn |
| AG2-639 | Chickahominy 230 kV | 20 | Battery | Withdrawn |
| AB1-135 | Charles City Solar | 14 | Solar | Withdrawn |
Charles City, VA: 16 requests in the PJM queue, 2 active totaling 223.3 MW.
A substation with the same name is named in PJM transmission planning materials: Chickahominy (DOM, 19 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 295 |
| MW capacity | 220.8 |
| MFO | 295 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.