Charles City, VA interconnection queue
2 active projects totalling 223.3 MW in the PJM queue, plus 14 with terminal status (shown greyed).
2active projects
223.3active MW
16total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC1-107 | Chickahominy Power | 500 | 1,600 | Gas | Withdrawn |
| AB2-068 | C4GT | 500 | 1,060 | Gas | Withdrawn |
| AG2-070 | Chickhominy-Surry 500 kV | 500 | 228 | Hybrid | Withdrawn |
| AC1-164 | Chickahominy Solar 1 and 2 | 230 | 220.8 | Solar | Partially in Service - Under Construction |
| AG1-543 | Not reported | n/r | 211.8 | Hybrid | Withdrawn |
| AF2-053 | Chickahominy 500kV | 500 | 200 | Gas | Withdrawn |
| AG2-475 | Chickahominy - Surry 500 kV | 500 | 200 | Battery | Withdrawn |
| AI1-013 | Chickahominy 230 kV | 230 | 200 | Battery | Withdrawn |
| C01-1373 | Chickahominy 230 kV | 230 | 200 | Battery | Withdrawn |
| AF1-329 | Chickahominy 230 kV | 230 | 172.5 | Solar | Withdrawn |
| AH1-042 | Stony Run Solar Project, LLC | 115 | 99.9 | Solar | Withdrawn |
| AI2-296 | Chickahominy 230kV | 230 | 83.2 | Solar | Withdrawn |
| AH1-288 | Chickahominy 230kV | 230 | 43.2 | Battery | Withdrawn |
| AI2-338 | Providence Forge-Turner 115kV | 115 | 29.2 | Solar | Withdrawn |
| AG2-639 | Chickahominy 230 kV | 230 | 20 | Battery | Withdrawn |
| AC1-060 | Charles City 1 | 34.5 | 2.5 | Gas | In Service |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.