Charles City, VA interconnection queue

3 active projects totalling 423.3 MW in the PJM queue, plus 13 with terminal status (shown greyed).

3active projects
423.3active MW
16total filed
Queue IDProjectkVMWResourceStatus
AC1-107 Chickahominy Power 500 1,600 Gas Withdrawn
AB2-068 C4GT 500 1,060 Gas Withdrawn
AG2-070 Chickhominy-Surry 500 kV 500 228 Hybrid Withdrawn
AC1-164 Chickahominy Solar 1 and 2 230 220.8 Solar Partially in Service - Under Construction
AG1-543 Not reported n/r 211.8 Hybrid Withdrawn
AF2-053 Chickahominy 500kV 500 200 Gas Withdrawn
AG2-475 Chickahominy - Surry 500 kV 500 200 Battery Withdrawn
AI1-013 Chickahominy 230 kV 230 200 Battery Withdrawn
C01-1373 Chickahominy 230 kV 230 200 Battery Active
AF1-329 Chickahominy 230 kV 230 172.5 Solar Withdrawn
AH1-042 Stony Run Solar Project, LLC 115 99.9 Solar Withdrawn
AI2-296 Chickahominy 230kV 230 83.2 Solar Withdrawn
AH1-288 Chickahominy 230kV 230 43.2 Battery Withdrawn
AI2-338 Providence Forge-Turner 115kV 115 29.2 Solar Withdrawn
AG2-639 Chickahominy 230 kV 230 20 Battery Withdrawn
AC1-060 Charles City 1 34.5 2.5 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.