Cartersville substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Cartersville as the point of interconnection, all in Cumberland County, VA.
Target commercial operation dates as filed run from Dec 2022 to Dec 2025 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-350 | Cartersville 230kV | 230 | 90 | Solar | Withdrawn | Dec 2025 |
| AH2-013 | Cartersville 34.5 kV | 34.5 | 16 | Hybrid | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cumberland County, VA
- Cunningham - Elmont: 2 active, 3,238 MW of 3 filed
- Cobbs Creek - James River Industrial: 1 active, 45 MW of 2 filed
- Buckingham- Farmville: none active of 4 filed