Buckingham- Farmville substation interconnection queue
1 active project totalling 51 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
51active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-439 | ACE Development Company, LLC | 230 | 51 | Solar | Active |
| AH1-440 | ACE Development Company, LLC | 230 | 34 | Battery | Withdrawn |
| AI1-011 | Buckingham- Farmville 230kV | 230 | 27.6 | Solar | Withdrawn |
| AI1-012 | Buckingham- Farmville 230kV | 230 | 18.4 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.