Bon Ayr 69 kV
PJM queue ID C01-1794
Bon Ayr 69 kV (C01-1794) is listed in the PJM interconnection queue as a 15 MW solar project in Barren County, KY. The filing names Bon Ayr as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.
| Queue ID | C01-1794 |
|---|---|
| Project name | Bon Ayr 69 kV |
| Status (as published) | Active |
| Substation | Bon Ayr |
| Point of interconnection | Bon Ayr 69 kV |
| County | Barren |
| State | KY |
| Voltage | 69 kV |
| Capacity | 15 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | cycle |
Same substation and county
Bon Ayr substation: 3 requests in the PJM queue, 1 active totaling 15 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-071 | Wood Duck 100 MW | 37.5 | Solar | Withdrawn |
| AG1-070 | Wood Duck 100 MW | 32.7 | Solar | Withdrawn |
Barren, KY: 17 requests in the PJM queue, 5 active totaling 98 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Wood Duck Solar LLC |
|---|---|
| Transmission owner | EKPC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 100.0 |
| MW capacity | 15.0 |
| MFO | 100.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/5/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.