Substation Scout

Bon Ayr 69 kV

PJM queue ID C01-1794

Bon Ayr 69 kV (C01-1794) is listed in the PJM interconnection queue as a 15 MW solar project in Barren County, KY. The filing names Bon Ayr as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.

Queue IDC01-1794
Project nameBon Ayr 69 kV
Status (as published)Active
SubstationBon Ayr
Point of interconnectionBon Ayr 69 kV
CountyBarren
StateKY
Voltage69 kV
Capacity15 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-31
Source datasetcycle

Same substation and county

Bon Ayr substation: 3 requests in the PJM queue, 1 active totaling 15 MW.

Queue IDProjectMWResourceStatus
AG1-071Wood Duck 100 MW37.5SolarWithdrawn
AG1-070Wood Duck 100 MW32.7SolarWithdrawn

Barren, KY: 17 requests in the PJM queue, 5 active totaling 98 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperWood Duck Solar LLC
Transmission ownerEKPC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy100.0
MW capacity15.0
MFO100.0
Submitted date4/24/2026
Last updated6/5/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.