Beaver-Davis Besse II substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-220 | Beaver-Davis Besse 345 kV II | 345 | 103.1 | Wind | Withdrawn |
| AD1-103 | Beaver-Davis Besse 345 kV II | 345 | 65.1 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.