Beaver-Davis Besse II substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Beaver-Davis Besse II as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Dec 2020 to Oct 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-220 | Beaver-Davis Besse 345 kV II | 345 | 103.1 | Wind | Withdrawn | Oct 2024 |
| AD1-103 | Beaver-Davis Besse 345 kV II | 345 | 65.1 | Wind | Withdrawn | Dec 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Erie County, OH
- Groton: 1 active, 45.2 MW of 2 filed
Other PJM queue substations in Huron County, OH
- Fitchville-New London: none active of 2 filed