Beaver-Davis Besse II substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-220 Beaver-Davis Besse 345 kV II 345 103.1 Wind Withdrawn
AD1-103 Beaver-Davis Besse 345 kV II 345 65.1 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.