Erie, OH interconnection queue

5 active projects totalling 262.8 MW in the PJM queue, plus 7 with terminal status (shown greyed).

5active projects
262.8active MW
12total filed
Queue IDProjectkVMWResourceStatus
C01-1624 Bloomingville - Beaver 345 kV 345 744.9 Gas Withdrawn
AI2-220 Beaver-Davis Besse 345 kV II 345 103.1 Wind Withdrawn
C01-1258 Davis Besse - Beaver 345 kV 345 103.1 Wind Active
AE2-176 Wheatsborough Solar 138 75 Solar In Service
AH1-417 Castalia 69 kV 69 50 Hybrid Withdrawn
AI2-219 Groton 138 kV II 138 45.2 Solar Withdrawn
C01-1261 Groton 138 kV 138 45.2 Solar Active
AD2-156 Avery 138 kV 138 42 Solar Withdrawn
AC2-103 Firelands Wind 345 38.7 Wind Under Construction
AG1-425 Groton 138 kV 138 20 Battery Withdrawn
W3-059A_AT6 Avery-Greenfield 138kV 138 12.9 Wind Withdrawn
AA1-006 Erie County Landfill n/r 0.8 Gas In Service