Erie, OH interconnection queue
6 active projects totalling 1,007.7 MW in the PJM queue, plus 6 with terminal status (shown greyed).
6active projects
1,007.7active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1624 | Bloomingville - Beaver 345 kV | 345 | 744.9 | Gas | Active |
| AI2-220 | Beaver-Davis Besse 345 kV II | 345 | 103.1 | Wind | Withdrawn |
| C01-1258 | Davis Besse - Beaver 345 kV | 345 | 103.1 | Wind | Active |
| AE2-176 | Wheatsborough Solar | 138 | 75 | Solar | In Service |
| AH1-417 | Castalia 69 kV | 69 | 50 | Hybrid | Withdrawn |
| AI2-219 | Groton 138 kV II | 138 | 45.2 | Solar | Withdrawn |
| C01-1261 | Groton 138 kV | 138 | 45.2 | Solar | Active |
| AD2-156 | Avery 138 kV | 138 | 42 | Solar | Withdrawn |
| AC2-103 | Firelands Wind | 345 | 38.7 | Wind | Under Construction |
| AG1-425 | Groton 138 kV | 138 | 20 | Battery | Withdrawn |
| W3-059A_AT6 | Avery-Greenfield 138kV | 138 | 12.9 | Wind | Withdrawn |
| AA1-006 | Erie County Landfill | n/r | 0.8 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.