Substation Scout

Huron, OH interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 12 with terminal status (shown greyed).

0active projects
0active MW
12total filed
Queue IDProjectkVMWResourceStatus
AD1-103 Beaver-Davis Besse 345 kV II 345 65.1 Wind Withdrawn
W3-005 Fostoria Central-Galion (FE) 345kV 345 65 Wind Withdrawn
X1-027A_AT12 Emerson Creek Wind Farm 345 65 Wind Withdrawn
AH1-094 Norwalk Solar I 69 29.9 Hybrid Withdrawn
AG2-109 Fitchville-New London 69 kV 69 28.1 Solar Withdrawn
AH2-156 Buckeye P-Wakeman 69 kV 69 24 Solar Withdrawn
AH1-224 Willard 69 kV 69 18 Solar Withdrawn
AH1-074 Fitchville-New London 69 kV 69 13.7 Solar Withdrawn
AH1-095 Wells - Shinrock 69 kV II 69 13 Hybrid Withdrawn
AC1-051 Willard-S. Greenwich 69kV 69 7.8 Wind Withdrawn
X3-023 6011 Greenwich Windpark, LLC 69 7.8 Wind Withdrawn
AH1-096 Wells - Shinrock 69 kv III 69 6.5 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.