Groton substation interconnection queue
1 active project totalling 45.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
45.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1261 | Groton 138 kV | 138 | 45.2 | Solar | Active |
| AG1-425 | Groton 138 kV | 138 | 20 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.