Fitchville-New London substation interconnection queue

1 active project totalling 28.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
28.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-109 Fitchville-New London 69 kV 69 28.1 Solar Active
AH1-074 Fitchville-New London 69 kV 69 13.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.