Bartonsville Energy Facility
PJM queue ID AE2-230
Bartonsville Energy Facility (AE2-230) is listed in the PJM interconnection queue as a 42 MW solar project in Frederick County, VA. The filing names Bartonsville-Meadow Brook as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 1, 2024.
| Queue ID | AE2-230 |
|---|---|
| Project name | Bartonsville Energy Facility |
| Status (as published) | In Service |
| Substation | Bartonsville-Meadow Brook |
| Point of interconnection | Bartonsville-Meadow Brook 138 kV |
| County | Frederick |
| State | VA |
| Voltage | 138 kV |
| Capacity | 42 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-07-01 |
| Source dataset | serial |
Same substation and county
Bartonsville-Meadow Brook substation: 2 requests in the PJM queue, 2 active totaling 48 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-291A | Bartonsville Energy Facility | 6 | Solar | In Service |
Frederick, VA: 23 requests in the PJM queue, 11 active totaling 615.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 70 |
| MW capacity | 42 |
| MFO | 70 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.